PLACE FOR BUSINESS LLC

PALACE FOR BUSINESS LLC specializes in an integrated approach in the design, construction, commissioning and of ready-made projects in the field of power supply and oil refineries in accordance with all technological requirements and interests of the customer. The main activity of the company is the implementation of power plant and oil refinery projects including full range of work for business, experience, reliability and safety in cooperation.

Why us?

Technology Selection:

Feasibility Study Components Technology Selection: Evaluating gas and steam turbine options..

Technical Details:

Technical Details Components and Configuration

Time Schedule:

Time Schedule and Pre-Construction Phase.

PALACE FOR BUSINESS LLC designs and constructs power plants and oil refineries in line with the client’s requirements and interests. The company’s specialists are capable of designing, preparing permitting documentation, and organizing construction.   

 1. Feasibility Study Components 

Technology Selection: Evaluating gas and steam turbine options. 

Efficiency: Combined cycle plants often achieve over 60% efficiency. 

Site Selection: Assessing resource availability, environmental impact and logistics. 

Economic Feasibility Operational Costs: Including fuel, maintenance and labor. 

Revenue Projections: Based on electricity market prices and demand. 

Environmental Impact Emissions: Assessing and mitigating environmental impact. 

Life Cycle Assessment: Considering the entire lifecycle from construction to decommissioning. 

Regulatory and Legal Feasibility Permits and Approvals: Securing necessary permits. 

Legal Framework: Understanding legal requirements for construction and operation. 

Risk Assessment Technical Risks: Identifying potential issues and mitigation strategies. 

Financial Risks: Economic fluctuations and changes in market demand. 

Environmental Risks: Managing potential environmental hazards. 

 2. Technical Details 

Components and Configuration Gas Turbines: Typically 1 or 2, each with 200-300 MW capacity. 

Heat Recovery Steam Generators (HRSGs): Capture exhausts heat to produce steam. 

Steam Turbines: Adds 200-300 MW, achieving over 60% efficiency. 

Cooling Systems: Essential for managing heat and ensuring performance. 

Performance Metrics Efficiency: Achieving over 60% efficiency.

Emissions: Approximately 50% less CO₂ compared to coal-fired plants. 

Output Range: Flexible, typically from 30 MW to over 1000 MW. 

Operational Considerations Fuel Flexibility: Primarily natural gas, but adaptable to other fuels. 

Startup Time: Quick startup times to meet peak demand. 

Maintenance: Regular maintenance for longevity and efficiency. 

3. Time Schedul

Pre-Construction Phase Feasibility Study

Planning Permitting and Approvals Site Preparation Construction Phase 

Foundation and Civil Works

Equipment Installation Gas Turbines HRSGs Steam Turbine 

Auxiliary Systems Mechanical and Electrical Works 

Commissioning Phase 

Initial Testing and Calibration Performance 

Testing Final Commissioning

Handover Post-Construction

Phase Operational Ramp-Up

5 steps to success

  1. Getting to know the company.
  2. Setting tasks for implementation.
  3. Design Work Agreement.
  4. Signing the contract.
  5. A ready-made profitable, successful project.

Order a call

Specify your contact phone number and we will call you back

Send a request
Attach your files